Blog
Topics
Tags
PrimeFab Launches PrimeSpace, a New Collection of Prefabricated Panelized Homes Built in Canada
PrimeFab announces the launch of PrimeSpace, a new collection of six prefabricated panelized home models manufactured in Midland, Ontario. Designed for accessory dwelling units, garden suites, cabins and multi-unit housing developments, PrimeSpace offers a faster, more efficient approach to residential...
Framing Contractors and Prefab: What’s Changing and Why It Matters
For decades, framing contractors have played a critical role in construction, turning building plans and materials into the structural framework of homes and commercial buildings. It’s demanding work, often complicated by weather delays, labour shortages, material waste, and coordination between...
Acton Project: 104 Prefabricated Panels Installed in 15 Days
PrimeFab delivered a complete panelized building system for a 4,643 sq. ft. child care centre in Acton, Ontario, including 104 prefabricated wall, floor, roof, and parapet panels installed in just 15 days....
The Cost Case for Panelized Construction: Savings Beyond Materials
Looking only at material invoices risks missing the bigger picture. Discover the true cost of panelized construction and learn how off-site manufacturing slashes on-site labour, eliminates weather delays, and accelerates your path to revenue....
From Factory Floor to Jobsite: How PrimeFab Panels Are Built
Go behind the scenes of PrimeFab’s 100,000-square-foot facility. Discover how we bridge the gap between digital design and rapid site installation through a highly controlled prefab wall assembly and off-site construction workflow....
Prefab Retrofit Solutions: Bringing Older Buildings Up to Code
Upgrading older commercial and multi-family buildings to modern energy standards does not always require demolition. Learn how PrimeFab’s PrimeWall prefab retrofit system is supporting deep energy retrofits like 444 Logan Ave, Toronto, where residents remain in place while the building...
Why Developers Are Moving Construction Indoors: The Advantage of Controlled Manufacturing
Traditional construction is a logistical puzzle of weather and overlapping trades. Learn how PrimeFab’s precision-engineered systems move the complexity off-site so you can focus on scaling....
Hanover Project: From Factory Floor to Full Close-In in One Week
For the Hanover project, PrimeFab delivered 103 prefabricated panels for an approximately 4,000 sq ft addition to an existing building. Panel installation was completed in 3 days, with full enclosure achieved in one week including the truss roof....
Reducing Trades Onsite: How Panelized Wall Systems Simplify Construction
Traditional construction is a logistical puzzle of scheduling, weather, and overlapping trades. Learn how PrimeFab’s precision-engineered PrimePanels use off-site manufacturing to move complexity off the jobsite, allowing you to scale your builds with confidence....
Let’s Get Started Building Smarter & Faster!
Connect with us today to discuss your project’s path forward.