The Right Fit for Developers, Builders & Framers

Our panelized building solutions streamline timelines, reduce site delays, and support consistent, repeatable performance. Builders, developers, and framing partners can work together to deliver projects faster and more efficiently year-round.

PrimePanel and PrimeWall are designed to support the speed and volume today’s developers demand. With automation, controlled manufacturing, and just-in-time delivery, our systems eliminate the bottlenecks that slow down traditional construction. No weather delays. No framing surprises. No coordinating multiple trades before your project can move forward.

Whether you’re building multi-residential communities, mid-rise developments, or large ICI projects, our solutions help you get to occupancy faster while reducing construction risk and maintaining quality. Developers who adopt panelized construction see improved ROI, greater productivity, and a clear path to scaling their build programs.

PrimeFab systems are designed to work in partnership with framing contractors. Instead of cutting and assembling lumber on site, framers install precision-manufactured panels delivered ready for installation. This approach allows framing crews to complete structures faster, improve site safety, and take on more projects each year.

Prefabricated Home on Muskoka Beach Road

With PrimePanel:

✓ Panels arrive pre-insulated, pre-sheathed, and labeled
✓ Faster to lock-up. Dry-in your building in days, not weeks
✓ Predictable schedules with fewer trades required onsite
✓ Cleaner, safer jobsites with minimal material waste
✓ Framing crews install engineered panels instead of cutting lumber onsite

What You’re Used To:

✗ Delays from weather, trade conflicts, and onsite waste

✗ Complicated coordination across framers, wrap crews, siding, and windows

✗ Material losses and inconsistent quality from job to job

A Better Way for Framing Contractors to Work

Traditional framing is labour-intensive and exposed to constant site challenges. PrimeFab panels allow framing crews to shift from cutting and assembling lumber onsite to installing precision-built structural assemblies delivered ready for placement.

Traditional framing is labour-intensive and exposed to constant site challenges. PrimeFab panels allow framing crews to shift from cutting and assembling lumber onsite to installing precision-built structural assemblies delivered ready for placement.

Are you a framing contractor interested in installing panelized systems?

Prefabricated wall panels being installed by PrimeFab at a child care centre construction project in Acton, Ontario.

Acton Project: 104 Prefabricated Panels Installed in 15 Days

PrimeFab delivered a complete panelized building system for a 4,643 sq. ft. child care centre in Acton, Ontario, including 104 prefabricated wall, floor, roof, and parapet panels installed in just 15 days....
Low-angle view of white panelized building exterior panels adjacent to a red wall against a blue sky.

The Cost Case for Panelized Construction: Savings Beyond Materials

Looking only at material invoices risks missing the bigger picture. Discover the true cost of panelized construction and learn how off-site manufacturing slashes on-site labour, eliminates weather delays, and accelerates your path to revenue....
Showing a prefabricated panel from PrimeFab at the factory and the same panel on the jobsite

From Factory Floor to Jobsite: How PrimeFab Panels Are Built

Go behind the scenes of PrimeFab’s 100,000-square-foot facility. Discover how we bridge the gap between digital design and rapid site installation through a highly controlled prefab wall assembly and off-site construction workflow....

Let’s Get Started Building Smarter & Faster!

Connect with us today to discuss your project’s path forward.